Road closed signs and barrels on a bridge

Getting around

Road closures in Staten Island, 2026

Where official closure news comes from, the highways through Staten Island, construction season and how to report a pothole.

Updated November 2026 · official sources and 2 highways

Right now

Check current closures near Staten Island

511NY lists current closures, lane restrictions, incidents and construction on state roads, updated by the state.

Open 511NY ↗ · Staten Island commute snapshot

Official sources

Where Staten Island road closure information comes from

2 highways

Highways through Staten Island

Interstates, US highways and state routes inside Staten Island's Census boundary, longest stretch first. Most planned closures on these roads are overnight lane closures.

New York State Department of Transportation (NYSDOT) maintains these roads; most other streets in Staten Island are maintained by New York City (NYC DOT). Closure notices for a highway come from the state, even where it runs through the area.

Report a problem

How to report a pothole or road problem in Staten Island

Construction season

Road construction season in Staten Island: March through November

Normal daily highs in Staten Island reach 50°F or more from March through November, the window when paving and most road projects are scheduled. Freeze-thaw months (December through February) open new potholes, so patching peaks in late winter and early spring.

MonthNormal highNormal lowPaving weather
January40°F26°FLimited · freeze-thaw
February43°F27°FLimited · freeze-thaw
March51°F34°FYes
April63°F44°FYes
May73°F54°FYes
June82°F64°FYes
July87°F69°FYes
August85°F68°FYes
September78°F61°FYes
October66°F49°FYes
November55°F39°FYes
December45°F31°FLimited · freeze-thaw

How this page is made

Highways are the Interstates, US highways and state routes inside Staten Island's Census boundary (Census boundary) in U.S. Census Bureau TIGER/Line 2024 road data, checked against current route designations (a retired number is shown as the route that replaced it, or left out) (source), longest stretch first.

Construction season uses NOAA 1991–2020 monthly normals from the Newark Intl AP, NJ station: months whose normal daily high is 50°F or more, the usual minimum for paving.

Official sources are the state road service the Staten Island getting-around page links. Checked 2026-11-17.

Questions

Road closures in Staten Island: answers

Where can I check road closures in Staten Island?

For every state road, use 511NY (511ny.org). Local street work is posted by New York City (NYC DOT) (portal.311.nyc.gov).

Which highways run through Staten Island?

I-278 and State Route 440 pass through Staten Island's Census boundary, based on Census road data. New York State Department of Transportation (NYSDOT) maintains Interstates, US highways and state routes, and local streets are maintained by New York City (NYC DOT).

How do I report a pothole in Staten Island?

On a local street, report it to New York City (NYC DOT) through NYC311. On I-278, State Route 440 or another state highway, report it to New York State Department of Transportation (NYSDOT). For a hazard that is dangerous right now, call 911.

When is road construction season in Staten Island?

Mostly March through November, when normal daily highs in Staten Island reach 50°F or more (NOAA 1991–2020 normals). Paving needs mild, dry weather, so work outside those months is usually limited to repairs.

When is pothole season in Staten Island?

Late winter and early spring. Staten Island averages 3 months with lows at or below freezing and highs above it (December through February); water that freezes and thaws in cracks is what opens most potholes.

Staten Island AI

Your Staten Island local guide
Hey there!

I'm Staten Island AI. Ask about local food, shops, museums or a neighborhood day.

AI recommendations may be inaccurate. Verify hours and prices. Questions are processed by Cloudflare. Privacy