Getting around
Road closures in Staten Island, 2026
Where official closure news comes from, the highways through Staten Island, construction season and how to report a pothole.
Updated November 2026 · official sources and 2 highways
Check current closures near Staten Island
511NY lists current closures, lane restrictions, incidents and construction on state roads, updated by the state.
Where Staten Island road closure information comes from
511NY
The state's traveler information service: closures, lane restrictions, incidents, construction and, where available, cameras and winter road conditions.
New York State Department of Transportation (NYSDOT)
Plans and builds the Interstates, US highways and state routes through Staten Island, including I-278 and State Route 440, and posts project and long-term closure notices.
NYC311
Local street closures for public works projects, utility work, parades and special events are posted here, usually under public works or engineering news.
Highways through Staten Island
Interstates, US highways and state routes inside Staten Island's Census boundary, longest stretch first. Most planned closures on these roads are overnight lane closures.
- I-278Interstate
- State Route 440State route
New York State Department of Transportation (NYSDOT) maintains these roads; most other streets in Staten Island are maintained by New York City (NYC DOT). Closure notices for a highway come from the state, even where it runs through the area.
How to report a pothole or road problem in Staten Island
NYC311
Potholes, broken signals, faded striping and debris on local streets go to New York City (NYC DOT) through this page.
New York State Department of Transportation (NYSDOT)
Problems on I-278, State Route 440 and other state highways go to the state, not the city.
Call 911
For a crash, a downed power line or a hazard in a travel lane that is dangerous right now, call 911 rather than filing a report online.
Road construction season in Staten Island: March through November
Normal daily highs in Staten Island reach 50°F or more from March through November, the window when paving and most road projects are scheduled. Freeze-thaw months (December through February) open new potholes, so patching peaks in late winter and early spring.
| Month | Normal high | Normal low | Paving weather |
|---|---|---|---|
| January | 40°F | 26°F | Limited · freeze-thaw |
| February | 43°F | 27°F | Limited · freeze-thaw |
| March | 51°F | 34°F | Yes |
| April | 63°F | 44°F | Yes |
| May | 73°F | 54°F | Yes |
| June | 82°F | 64°F | Yes |
| July | 87°F | 69°F | Yes |
| August | 85°F | 68°F | Yes |
| September | 78°F | 61°F | Yes |
| October | 66°F | 49°F | Yes |
| November | 55°F | 39°F | Yes |
| December | 45°F | 31°F | Limited · freeze-thaw |
How this page is made
Highways are the Interstates, US highways and state routes inside Staten Island's Census boundary (Census boundary) in U.S. Census Bureau TIGER/Line 2024 road data, checked against current route designations (a retired number is shown as the route that replaced it, or left out) (source), longest stretch first.
Construction season uses NOAA 1991–2020 monthly normals from the Newark Intl AP, NJ station: months whose normal daily high is 50°F or more, the usual minimum for paving.
Official sources are the state road service the Staten Island getting-around page links. Checked 2026-11-17.
Road closures in Staten Island: answers
Where can I check road closures in Staten Island?
For every state road, use 511NY (511ny.org). Local street work is posted by New York City (NYC DOT) (portal.311.nyc.gov).
Which highways run through Staten Island?
I-278 and State Route 440 pass through Staten Island's Census boundary, based on Census road data. New York State Department of Transportation (NYSDOT) maintains Interstates, US highways and state routes, and local streets are maintained by New York City (NYC DOT).
How do I report a pothole in Staten Island?
On a local street, report it to New York City (NYC DOT) through NYC311. On I-278, State Route 440 or another state highway, report it to New York State Department of Transportation (NYSDOT). For a hazard that is dangerous right now, call 911.
When is road construction season in Staten Island?
Mostly March through November, when normal daily highs in Staten Island reach 50°F or more (NOAA 1991–2020 normals). Paving needs mild, dry weather, so work outside those months is usually limited to repairs.
When is pothole season in Staten Island?
Late winter and early spring. Staten Island averages 3 months with lows at or below freezing and highs above it (December through February); water that freezes and thaws in cracks is what opens most potholes.